Palo, Philippines

50 MWp. Fixed-tilt structure
Execution time– 6 Months

  • Power: 50 MW
  • Location: Palo – Leyte - Philippines
  • Structure: Fixed 3V
  • Modules: Aleo, AUO, Ritek
  • Inverters: Gamesa, central inverters
  • Commissioning: 2016
  • Client: Sepalco
  • Scope: Technical Consultant, Engineering Construction Supervision, Commissioning